Suzuki GSX1300BK B-King Service Manual page 420

Hide thumbs Also See for GSX1300BK B-King:
Table of Contents

Advertisement

8) Hold the starter clutch with the special tool.
9) Remove the starter clutch.
Special tool
(A): 09920–34830 (Starter clutch holder)
Installation
Installation is in the reverse order of removal. Pay
attention to the following points:
CAUTION
!
Replace the gaskets with new ones to
prevent oil leakage.
• When installing the starter clutch, align the wide spline
tooth of starter clutch with that of crankshaft.
(A)
I823H1190022-01
I823H1190024-01
• With the starter clutch held immovable using the
special tool, tighten the starter clutch bolt to the
specified torque.
Special tool
(A): 09920–34830 (Starter clutch holder)
Tightening torque
Starter clutch bolt: 55 N·m (5.5 kgf-m, 40.0 lb-ft)
(A)
• Apply a bond lightly to the mating surfaces at the
parting line between the upper and lower crankcases.
: Sealant 99000–31140 (SUZUKI BOND
No.1207B or equivalent)
• Apply grease to the starter motor O-ring.
: Grease 99000–25010 (SUZUKI SUPER
GREASE A or equivalent)
• Fit the new gasket to the bolt "A".
Starting System:
1I-11
I823H1190025-04
I823H1190026-02
"A"
I823H1190027-02

Advertisement

Table of Contents
loading

Table of Contents