Excva Inspection; Excva Pulley Inspection; Excva Adjustment - Suzuki GSX1300BK B-King Service Manual

Hide thumbs Also See for GSX1300BK B-King:
Table of Contents

Advertisement

• Install the EXCVA.
Tightening torque
EXCVA mounting bolt (b): 10 N·m (1.0 kgf-m, 7.0
lb-ft)
(b)
• Install the EXCV cables. Refer to "EXCV Cable
Removal and Installation (Page 1K-5)".
• Connect the ECM and battery. Refer to "ECM
Removal and Installation in Section 1C (Page 1C-2)".
• Adjust the EXCVA. Refer to "EXCVA Adjustment
(Page 1K-9)".
• Install the EXCV cover.
Tightening torque
EXCV cover bolt (c): 10 N·m (1.0 kgf-m, 7.0 lb-ft)
(c)

EXCVA Inspection

Refer to "DTC "C46" (P1657-H/L or P1658): EXCV
Actuator Circuit Malfunction in Section 1A (Page 1A-
110)".

EXCVA Pulley Inspection

Inspect the EXCVA pulley in the following procedures:
1) Remove the EXCVA pulley. Refer to "EXCV Cable
Removal and Installation (Page 1K-5)".
2) Visually inspect the EXCVA pulley for wear and
damage. If there is anything unusual, replace the
pulley with a new one.
I823H11B0019-01
3) Install the pulley and EXCVA. Refer to "EXCVA
Removal and Installation (Page 1K-7)".

EXCVA Adjustment

Inspect the EXCVA operation and adjust it if necessary
in the following steps:
Step 1
1) Set the EXCVA to the adjustment position. Refer to
"EXCV Cable Removal and Installation (Page 1K-
(c)
5)".
Step 2
1) Turn the ignition switch OFF.
2) Turn the mode select switch OFF.
3) Turn the ignition switch ON and check the operation
of EXCVA.
I823H11B0020-03
(EXCVA operation order: Full close
Approx. 40% open)
B823H11B06010
Exhaust System:
1K-9
B823H11B06011
I823H11B0021-01
B823H11B06012
Full open
I823H1110159-01

Advertisement

Table of Contents
loading

Table of Contents