Throttle Body Construction - Suzuki GSX-R750 Service Manual

Hide thumbs Also See for GSX-R750:
Table of Contents

Advertisement

Throttle Body Construction

1. Intake pipe
2. Air cleaner outlet tube
3. EVAP system purge control solenoid valve
(E-33 only)
4. STVA sub cover
: Fit the cut part of the cover to the boss of
the throttle body.
5. IAT sensor
1
2
(a)
4
5
"C"
(b)
"D"
6. ISC valve hose
"A": Face the clamp end backward. (E-33 only)
"B": Tighten the purge solenoid valve bracket and
EXCVA together. (E-33 only)
"C": Face the clamp end downward.
"D": White marking
Engine Mechanical:
3
"B"
"A"
"3"
"5"
"1"
"2"
"4"
6
"F"
"E": Evenly tighten the bolts in the
order of "1" to "5".
"F": Pass the fuel pump lead wire
above the fuel nipple.
: 10 N⋅m (1.0 kgf-m, 7.0 lb-ft)
: 1.3 N⋅m (0.13 kgf-m, 1.0 lb-ft)
: 10 N⋅m (1.0 kgf-m, 7.0 lb-ft)
1D-9
B838H21406009
"E"
(c)
I838H1140001-02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents