Installation Guidelines
and Requirements
Your Preinstallation Responsibilities
This chapter reviews preinstallation considerations such as electrical,
environmental, and safety compliances for E-series routers. For complete
system specifications, refer to
Topic
Your Preinstallation Responsibilities
Environmental Requirements
Regulatory Compliances
Safety Guidelines
Equipment Rack Requirements
Cabling Recommendations
Complete the following tasks before installing the system:
•
Verify that the electrical supply meets all AC and DC power
requirements. See
•
Verify that the site meets all environment specifications. See
Environmental Requirements
System
Specifications.
•
Verify that the cables you plan to use meet the specifications, and
review the cabling recommendations. See
later in this chapter.
•
Verify the operation of all telephone circuits, digital services, and T1
facilities required for installation.
Chapter 11, System
Chapter 11, System
later in this chapter and
Specifications.
Specifications.
Chapter 11,
Cabling Recommendations
3
Page
3-1
3-2
3-2
3-3
3-4
3-8