Verifying The Upgrade - Juniper E-Series Installation And User Manual

Juniper router installation and user guide
Hide thumbs Also See for E-Series:
Table of Contents

Advertisement

9-8
CHAPTER 9
Maintaining E-Series Routers

Verifying the Upgrade

Figure 9-3 SODIMM sockets on the SRP-40 module
2
Insert a SODIMM from the upgrade kit at an angle of
approximately 45 degrees into an empty ceramic connector, so that
the notch in the long gold edge of the SODIMM aligns with the
notch in the connector.
The notch on the long gold edge will no longer be visible when the
SODIMM is pressed in far enough.
3
Press the top surface downward
snaps into place and holds it.
4
Repeat steps 2 through 3 with the other SODIMM.
5
Repeat steps
1
through 4 for the other SRP module, if present.
To verify that the upgrade is complete:
1
Place the SRP modules in the chassis.
The SRP modules will reboot.
2
Close the ejector handles and tighten the thumbscrews.
3
Issue the show hardware command, and verify that the display
indicates that the correct amount of memory is present.
into the socket until the socket spring

Advertisement

Table of Contents
loading

Table of Contents