APPENDIX B
Installation Guidelines and Requirements
Your Preinstallation Responsibilities
Environmental Requirements
Copyright © 2010, Juniper Networks, Inc.
This chapter reviews preinstallation considerations such as electrical, environmental,
and safety compliances for the router. For complete system specifications, see "System
Specifications" on page 89.
This chapter contains the following sections:
Complete the following tasks before installing the system:
Verify that the electrical supply meets all AC and DC power requirements. See "System
Specifications" on page 89.
Verify that the site meets all environment specifications. See "Environmental
Requirements" on page 95 and "System Specifications" on page 89.
Verify that the cables you plan to use meet the specifications, and review the cabling
recommendations. See "Cabling Recommendations" on page 99.
Verify the operation of all telephone circuits, digital services, and T1 facilities required
for installation.
Ensure that all IP requirements are met, such as IP addresses, subnet masks, and any
specific routing protocol information.
See "System Specifications" on page 89 for complete environmental specifications.