Daikin SkyAir RZQ200 · 250C7Y1B Service Manual page 88

R-410a heat pump 50hz
Table of Contents

Advertisement

SiBE26-701
Items
Key points
Power
Inverter
To replace the PC board assembly with
supply
PC
service parts, follow the procedure shown
section and
board
below.
PC board
[Procedure]
replacement
1. Disconnect all connectors and
2. Unfasten the screws that fix the plastic
3. Dismount the Inverter PC board
4. Mount a new inverter PC board
5. Connect the connectors and terminals.
Control
When replacing to a spare control PC
PC
board, install a capacity setting adapter to
board
meet the capacity. The capacity is written
in E
control PC board.
Electric discharge of
During the compressor stops operating,
capacitor
controls the electric discharge of
capacitor. In this case, a noise may be
heard, while it is not an abnormal status.
Residual electric
Before conducting maintenance of the
charge of capacitor
switch box, turn off the power switch, and
make sure that the voltage between the
capacitor terminals is 50 VDC or less. If it
is not possible to check the voltage, wait
for 10 minutes or more before servicing.
Not possible to improve
On standard models, it was possible to
power factor by
increase the power factor by installing a
installation of phase-
capacitor. On inverter models, installation
advance capacitor
of a capacitor can damage the IGBT. Be
sure not to install a capacitor on inverter
models.
Selection of leakage
Select a leakage breaker (high-
breaker
harmonics/high-frequency non-operating
type) designed for inverters. If the
leakage breaker is not designed for
inverters, high frequency can result in a
malfunction.
Does not result in malfunction stop, and
Fin temperature
the unit will automatically reset after
increase
standby for 3 minutes. The fin
temperature increase can be checked by
service mode or LED on the PC board.
* Capacity setting is made with DIP switches on the PC board. For more information, refer to
Troubleshooting
terminals connected to the PC board.
PC board box.
assembly from the sheet metal part.
assembly to the sheet metal part.
2
PROM at factory but not in the spare
"Maintenance and Repair Manual".
Items
Key points
Instantaneo-
Insufficient voltage and instantaneous
us power
power failure resulted in an operation
failure
shutdown due to "U2" error (supply
detection
voltage abnormality).
Fan residual
The fan operates for about 30 seconds to
operation
cool the inverter after the compressor
stops operating. If the fin temperature is
high, the fan will keep operating until the
fin temperature lowers.
Fan motor
Before replacing the fan motor, make
replacement
sure that the fan is not operating and
disconnect the fan motor connector from
the PC board. If the fan is operating, the
fan motor generates power to supply
voltage to the PC board circuit. Further,
make sure that the voltage between the
capacitor terminals of the main circuit is
50 V or less before replacing the fan
motor. To prevent the PC board from
damage, touch the grounding terminal of
the switch box by hands without fail to
relieve static electricity from yourself right
before detaching the connector.
DC fan
If the contrary winds blow hard, the
motor
contrary winds are automatically detected
to stop the fan and conduct heat
exchange utilizing the natural wind. In this
case, the fan motor may not output
voltage, while such an operating status is
not abnormal.
Pump down
The LPS cannot be activated by closing
operation
the stop valve while in cooling operation.
Be sure to use the "Pump Down Switch"
to collect the refrigerant. Because
refrigerant gas remains in the field piping,
be sure to collect residual gas using a
refrigerant recovery unit.
Pay
Top panel sealing materials have a
attention to
function to prevent water from entering
damaged
from the fan chamber to the mechanical
sealing
chamber (electrical components) and
materials on
dew condensation water on the top panel
the top
from dropping on the switch box.
panel
Therefore, if delamination and breakage
of sealing materials occurs during
servicing, replace them.
Maintenance Inspections
77

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents