Test Operation Setting Procedure; Emergency Operation (When The Remote Controller Is Lost) - Daikin SkyAir RZQ200 · 250C7Y1B Service Manual

R-410a heat pump 50hz
Table of Contents

Advertisement

SiBE26-701
3.2

Test Operation Setting Procedure

1. Push the Inspection/Test Operation button on the remote controller 4 times.
2. When the Start/Stop button is pushed after the test operation mode is set, test operation
* The first operation after installation can be set either by field setting (Setting mode 1) using
3.3
Emergency Operation (When the Remote Controller is
Lost)
When the remote controller does not work due to battery failure or is lost, use this switch which
is located beside the discharge grille on the main unit. When the remote controller does not
work, but the battery low indicator on it is not lit, contact your dealer.
[START]
1
To press the emergency operation switch.
The machine runs in the previous mode.
The system operates with the previously set air flow direction.
[STOP]
2
Press the EMERGENCY OPERATION switch again.
Field Setting
Normal mode
starts.
the outdoor PCB or by remote control setting.
The first operation after installation is always cooling operation (test operation control).
Because the test operation control finishes in approximately 3 minutes, continue operation by
returning to the normal operation mode.
Push the Inspection/Test Operation
button 4 times.
Test operation mode
Emergency Operation
45

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents