Rzq200 · 250C7Y1B; Procedure For Removal Related To Outside Panel - Daikin SkyAir RZQ200 · 250C7Y1B Service Manual

R-410a heat pump 50hz
Table of Contents

Advertisement

RZQ200 · 250C7Y1B
1. RZQ200 · 250C7Y1B
1.1

Procedure for Removal Related to Outside Panel

Procedure
Step
1. Remove the top panel,
etc.
1
Unscrew the four
screws and pull up the
discharge grill.
Unscrew the ten screws
2
and pull up the top
panel.
2. Remove the front panel
(upper)
Unscrew the five fixing
1
screws and pull out the
front panel (upper).
3. Remove the front panel
Unscrew the four
1
screws and pull out the
front panel (middle).
2
Unscrew the seven
screws and pull out the
front panel (bottom).
4. Remove the protective
wire guard
Unscrew the six
1
screws, tilt the upper
part of the protective
wire guard toward you
and pull up the
protective wire guard.
194
Warning
Be sure to commence the disassembling work after 10 minutes or
more elapsed from all power supplies have been turned off.
Procedure
Discharge
grill
Top panel
Front panel
(upper)
Front panel
(middle)
Front panel
(bottom)
A A
Protective wire guard
SiBE26-701
Points
It is possible to remove the
top panel assembly as a
whole without dismounting
the discharge grill from the
top panel.
When using a stepladder,
place it in a secure manner
for safe operation.
There is a hook on the both
sides of the front panel
(upper).
Hook
View from Arrow A
Protective
wire guard
Bottom frame
Removal Procedure

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents