Ups Setup; Checking The Ups Accessories - Eaton Powerware Series User Manual

Bladeups 12 kva powerware series
Hide thumbs Also See for Powerware Series:
Table of Contents

Advertisement

UPS Setup

12. Attach the rear hold-down brackets to the rail and slide the brackets into the slots
on the EBM rear panel (see Figure 16).
13. Verify that the brackets are seated firmly, then tighten the wing nuts on the rear
hold-down brackets. The EBM is now secured in the rack.
14. Continue to the following section, "UPS Setup."
The BladeUPS module comes with all hardware required for installation in a standard
EIA or JIS seismic rack-mount configuration with square and round mounting holes.
The rail assemblies adjust to mount in 48-cm (19-inch) racks with front to rear rail
distances from 61 to 76 cm (24 to 30 inches) deep.

Checking the UPS Accessories

Verify that the following items are included with the UPS:
S
UPS front cover
S
Communication terminal block connectors:
- (3) two-pin connectors
- (2) two-pin connectors with jumpers
- (1) three-pin connector
S
(2) wire saddles
S
Communication cable (DB-9/DB-9)
EATON BladeUPS
®
(12 kVA) User's Guide
Figure 16. Securing the Back of the EBM
S
164201649 Rev 4www.eaton.com/powerquality
INSTALLATION
Rear Hold-Down
Bracket
29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bladeups 12Bladeups 12i

Table of Contents