12. Attach the rear hold-down brackets to the rail and slide the brackets into the slots on the EBM rear panel
(see Figure 43).
Figure 43. Securing the Back of the EBM
13. Verify that the brackets are seated firmly, then tighten the wing nuts on the rear hold-down brackets. The
EBM is now secured in the rack.
14. Continue to the "UPS Setup" section.

UPS Setup

The UPS comes with all hardware required for installation in a standard EIA or JIS seismic rack-mount
configuration with square and round mounting holes. The rail assemblies adjust to mount in 48-cm (19-inch)
racks with front to rear rail distances from 61 to 76 cm (24 to 30 inches) deep.

Checking the UPS Accessories

Verify that the following items are included with the UPS:
UPS front cover
l
Communication terminal block connectors:
l
- (3) two-pin connectors
- (2) two-pin connectors with jumpers
- (1) three-pin connector
(2) wire saddles
l
Communication cable (DB-9/DB-9)
l
Documentation and software tools
l
- Software Suite CD
- BladeUPS: Documents, Firmware, and Installation Video CD
- This user's guide
Mounting brackets and fasteners (if not already installed):
l
- (2) mounting brackets
- (8) 6-32 flat-head screws
Rear Hold-Down
Bracket
Eaton BladeUPS 12 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 7
Standard System Installation
57