Parallel Ups Installation - Eaton Powerware Series User Manual

Bladeups 12 kva powerware series
Hide thumbs Also See for Powerware Series:
Table of Contents

Advertisement

REPO (NO)
REPO (NC)
Load
Connector
Communication Port
Output Power Cord
Figure 32. BladeUPS Module Rear Panel (Standalone UPS Shown with IEC 309-60A Output Power Cord)

Parallel UPS Installation

X-Slot Communication Bay 1
Ground
Bonding
Screw
Input Power Cord
NOTE The load connector breaker controls the load connector only, not the output power cord.
Follow the appropriate procedure for the type of parallel configuration.
S
Follow the procedure "New Multiple Parallel UPS Installation" on page 44 if you
are installing multiple UPSs in a new parallel configuration.
In this case, two blue terminating plugs are supplied with each UPS. None of the
Powerware Hot Sync CAN Bridge Cards contains a Jumper J7.
EATON BladeUPS
®
(12 kVA) User's Guide
Load
Connector
Input
Breaker
Breaker
X-Slot Communication Bay 2
S
164201649 Rev 4www.eaton.com/powerquality
INSTALLATION
Battery
Breaker
UPS
Battery
Connector
Surge
Protection
(leave
installed)
43

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bladeups 12Bladeups 12i

Table of Contents