OPERATION
Setting Power Strategy
Configuring Battery Settings
74
EATON BladeUPS
To set the power strategy:
1.
Press any button to activate the menu options, then select SETTINGS, USER
SETTINGS, and POWER STRATEGY.
2.
Select HIGH EFFICIENCY or STANDARD, and OK to confirm.
Set the UPS for the number of EBMs installed, whether to:
S
Set the level for the Battery Low alarm
S
Run automatic battery tests
Configuring the UPS for EBMs
To ensure maximum battery runtime, configure the UPS for the correct number of
EBMs:
1.
Press any button on the front panel display to activate the menu options, then
select SETTINGS, USER SETTINGS, BATTERY SETUP, and NUMBER OF EBMS.
2.
Use the
or buttons to select the number of EBMs according to your UPS
configuration:
All UPS and EBM Cabinets
3.
Press the
ESC
4.
Press the
S
®
(12 kVA) User's Guide
164201649 Rev 4www.eaton.com/powerquality
UPS only
UPS + 1 EBM
UPS + 2 EBMs
UPS + 3 EBMs
UPS + 4 EBMs
button to save the setting.
button until the Start screen appears.
Number of EBMs
0 (default)
1
2
3
4