Eaton Powerware Series User Manual page 93

Bladeups 12 kva powerware series
Hide thumbs Also See for Powerware Series:
Table of Contents

Advertisement

NOTE Always test the REPO function before applying your critical load to avoid accidental load loss.
UPS 6 REPO Terminals
2
+ Polarity
Normally-Open
1
– Polarity
2
+ Polarity
Normally-Closed
– Polarity
1
UPS 5 REPO Terminals
2
+ Polarity
Normally-Open
1
– Polarity
2
+ Polarity
Normally-Closed
– Polarity
1
UPS 4 REPO Terminals
2
+ Polarity
Normally-Open
1
– Polarity
2
+ Polarity
Normally-Closed
– Polarity
1
UPS 3 REPO Terminals
2
+ Polarity
Normally-Open
– Polarity
1
2
+ Polarity
Normally-Closed
– Polarity
1
UPS 2 REPO Terminals
2
+ Polarity
Normally-Open
1
– Polarity
2
+ Polarity
Normally-Closed
– Polarity
1
UPS 1 REPO Terminals
2
+ Polarity
Normally-Open
– Polarity
1
2
+ Polarity
Normally-Closed
– Polarity
1
Figure 53. Normally-Open REPO Switch Wiring in a Parallel System
EATON BladeUPS
®
(12 kVA) User's Guide
Factory-Installed Jumper Wire
(do not remove)
S
164201649 Rev 4www.eaton.com/powerquality
COMMUNICATION
REPO Switch
(Normally-Open)
85

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bladeups 12Bladeups 12i

Table of Contents