Eaton Powerware Series User Manual page 59

Bladeups 12 kva powerware series
Hide thumbs Also See for Powerware Series:
Table of Contents

Advertisement

7.
Determine where you anticipate locating the UPS in the configuration:
S
If you plan to install the UPS as the first UPS in the configuration, install one of
the supplied blue terminating plugs (see Figure 39) into the CAN IN port on the
UPS. Retain the second blue terminating plug for future use.
S
If you plan to install the UPS as the last UPS in the configuration, install one of
the supplied blue terminating plugs (see Figure 39) into the CAN OUT port on
the UPS. Retain the second blue terminating plug for future use.
S
If you plan to install the UPS in an intermediate position in the configuration
(neither the first nor the last UPS), leave both the CAN IN port and CAN OUT
port empty. Retain both blue terminating plugs for future use.
Blue Terminating Plug (CAN IN)
Figure 39. Installing the Blue Terminating Plug
8.
Tighten the screws securing the Powerware Hot Sync CAN Bridge Card in its
X-Slot communication bay.
9.
If you are installing power management software, connect your computer to the
UPS communication port or optional X-Slot card (see page 77). For the
communication port, use the supplied serial cable.
NOTE You can install one ConnectUPS-X Web/SNMP Card per UPS, or one card per parallel system.
Installing one card per UPS provides communication with each UPS. Installing one card per parallel system
provides detection of a problem with at least one UPS, but does not specify which UPS or how many.
10. If you left the UPS unattached to the rack, secure the front and rear of the UPS
as described in Steps 14 and 15 on page 35.
EATON BladeUPS
®
(12 kVA) User's Guide
Blue Terminating Plug
(CAN OUT)
S
164201649 Rev 4www.eaton.com/powerquality
INSTALLATION
51

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bladeups 12Bladeups 12i

Table of Contents