Eaton Powerware Series User Manual page 34

Bladeups 12 kva powerware series
Hide thumbs Also See for Powerware Series:
Table of Contents

Advertisement

INSTALLATION
26
EATON BladeUPS
3.
Secure the rail to the front of the rack with two hex-head screws (see Figure 11).
S
®
(12 kVA) User's Guide
164201649 Rev 4www.eaton.com/powerquality
Figure 10. Front Rail Screw Positions for the EBM
Front Rail Hex-Head Screws
Figure 11. Securing the Front Rail
Position 15
Second Rail
Position 10
Position 6
First Rail
Position 1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bladeups 12Bladeups 12i

Table of Contents