Single Parallel-Ready Ups Installation - Eaton Powerware Series User Manual

Bladeups 12 kva powerware series
Hide thumbs Also See for Powerware Series:
Table of Contents

Advertisement

20. Continue to "Parallel System Initial Startup" on page 60.
Figure 37. Connecting UPSs to the BladeUPS Bar (Bottom Entry Shown)

Single Parallel-Ready UPS Installation

Only qualified service personnel (such as a licensed electrician) shall perform the electrical installation. Risk
of electrical shock.
NOTE Do not make unauthorized changes to the UPSs; otherwise, damage may occur to your equipment
and void your warranty.
To install one UPS in a parallel-ready configuration:
1.
Verify that the UPS is installed in a rail kit in a rack containing a BladeUPS Bar.
2.
Switch off utility power to the distribution point where the parallel-ready UPS
system will be connected. Be absolutely sure there is no power.
EATON BladeUPS
®
(12 kVA) User's Guide
W A R N I N G
S
164201649 Rev 4www.eaton.com/powerquality
INSTALLATION
49