Chapter 2 Hardware Installation And Connection; Mounting The Switch On A Rack; Rack-Mounted Installation Requirements - ZyXEL Communications MGS-3712F User Manual

Metrogigabit switch
Hide thumbs Also See for MGS-3712F:
Table of Contents

Advertisement

Chapter 2 Hardware Installation and Connection

Attach the rubber feet to each corner on the bottom of the Switch. These rubber
5
feet help protect the Switch from shock or vibration and ensure space between
devices when stacking.
Figure 5 Attaching Rubber Feet
Note: Do NOT block the ventilation holes. Leave space between devices when
stacking.

2.3 Mounting the Switch on a Rack

The Switch can be mounted on an EIA standard size, 19-inch rack or in a wiring
closet with other equipment. Follow the steps below to mount your Switch on a
standard EIA rack using a rack-mounting kit.

2.3.1 Rack-mounted Installation Requirements

• Two mounting brackets.
• Eight M3 flat head screws and a #2 Philips screwdriver.
• Four M5 flat head screws and a #2 Philips screwdriver.
Failure to use the proper screws may damage the unit.
2.3.1.1 Precautions
• Make sure the rack will safely support the combined weight of all the equipment
it contains.
• Make sure the position of the Switch does not make the rack unstable or top-
heavy. Take all necessary precautions to anchor the rack securely before
installing the unit.
30
MGS-3712/MGS-3712F User's Guide

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mgs-3712

Table of Contents