Cp Workgroup System Cabling Tables; C3000 Configuration With External Control Node Connection To The Infiniband Interconnect - HP Cluster Platform Express v2010 Overview

Workgroup system and cluster platform express overview and hardware installation guide
Hide thumbs Also See for Cluster Platform Express v2010:
Table of Contents

Advertisement

Figure B-6 c3000 Configuration with External Control Node Connection to the InfiniBand Interconnect
2
1
The following list describes the callouts shown in
1.
Connection from the HP 4X DDR InfiniBand Switch to the Control Node InfiniBand HCA
2.
HP GbE2c switch
3.
Connection from the HP GbE2c to the control node's NIC1 port
4.
Connection to HP GbE2c (IMB1) from the OA external link port
5.
Optional connection to an external network (for example, a campus network)
6.
Onboard Administrator module
7.
HP 4X DDR InfiniBand Switch — IMB3/4
Note:
Only one connection from each HP GbE2c switch is necessary in configurations with an optional
high-speed InfiniBand network.
For the administrative, console, and Gigabit Ethernet network and also the optional Infiniband
network cabling tables for CPE BladeSystem configurations, see
B.2 CP Workgroup System Cabling Tables
Table B-1
provides the following cabling tables:
Cabling tables for CP Workgroup System with c3000 enclosure with single-density or
double-density server blades (see
Cabling tables for CP Workgroup System with c3000 enclosure with the InfiniBand fabric
(see
Section
For the port-labeling syntax for the CP Workgroup System cabling tables, see
2
3
4
Section
B.2.2)
5
6
7
Figure
B-6:
Section
B.2.1)
B.2 CP Workgroup System Cabling Tables
B.2.
Appendix
A.
69

Advertisement

Table of Contents
loading

Table of Contents