HP Cluster Platform Express v2010 Overview page 125

Workgroup system and cluster platform express overview and hardware installation guide
Hide thumbs Also See for Cluster Platform Express v2010:
Table of Contents

Advertisement

Index
Symbols
22U cabinet configuration
BladeSystem, 43
rack-mountable servers, 56
22U configuration example
BladeSystem with c3000 enclosure, 38
BladeSystem with one enclosure, 48
BladeSystem with two enclosures, 48
22U configuration example – without external control
node
BladeSystem with c3000 enclosure, 38
42U cabinet configuration
BladeSystem, 43
rack-mountable, 55
rack-mountable components, 55
42U configuration example
BladeSystem with one enclosure, 47
BladeSystem with three enclosures, 44
BladeSystem with two enclosures, 46
A
about this document, 9
address of port, 121
administration interconnect
wiring for one enclosure, 69
administrative network, 26
cabling tables, 76, 116
audience, 9
B
BladeSystem
c7000, 12
cabinet configuration, 43
cabling tables, 75
external control nodes, 24
port labeling syntax, 61
power distribution unit, 113
ProLiant DL140 G3 as external node, 24
ProLiant DL145 G3 as external node, 24
ProLiant DL380 G5 as external node, 24
ProLiant DL385 G2 as external node, 24
software management requirements, 51
BladeSystem c3000
power distribution unit, 111
BladeSystem configuration example
22U with c3000 enclosure, 38
22U with c3000 enclosure without external control
node, 38
22U with one enclosure, 48
22U with two enclosures, 48
42U with one enclosure, 47
42U with three enclosures, 44
42U with two enclosures, 46
BladeSystem configurations, 43
bracket, 23
C
c-Class enclosure
22U example with one c3000 enclosure, 38
22U example with one c3000 enclosure without external
control node, 38
22U example with one enclosure, 48
22U example with two enclosures, 48
42U example with one enclosure, 47
42U example with three enclosures, 44
42U example with two enclosures, 46
cabling multiple enclosures, 77
cabling one enclosure, 76
power requirements, 114
c3000
device bay utilization, 111
enclosure, 11
interconnect module bay utilization, 111
software, 41
VLAN (see configuring VLAN)
c7000 (see BladeSystem)
software, 51
c7000 enclosure, 12
cabling tables, 75
cabinet configuration
22U BladeSystem, 43
22U rack-mountable servers, 56
42U BladeSystem, 43
BladeSystem, 43
cable
bundles, 23
downlink, 122
port address, 121
uplink, 122
cable management plate, 23
cable types
local I/O cable, 52
cabling
administrative Ethernet tables, 76, 116
c3000 (see CP Workgroup System wiring)
console Ethernet tables, 119
guidelines, 24
InfiniBand tables, 122
multiple c-Class enclosures, 77
network tables, 115
one c-Class configuration, 76
rules, 121
cabling tables (see c7000 enclosure)
CP Workgroup System, 63
using, 121
cluster
22U, front view, 56, 57
22U, rear view, 56, 57
Admin and Console networks, 57
Administrative and Console networks, 56
compute nodes, 56, 57
125

Advertisement

Table of Contents
loading

Table of Contents