HP Cluster Platform Express v2010 Overview page 5

Workgroup system and cluster platform express overview and hardware installation guide
Hide thumbs Also See for Cluster Platform Express v2010:
Table of Contents

Advertisement

D.6 Administrative/Console Wiring Tables for Three c7000 Enclosures with Double-Density Server
Blades and the InfiniBand Fabric..........................................................................................................84
D.7 One c7000 Enclosure with Single-Density Blades and an HP 4x DDR InfiniBand Switch
Module..................................................................................................................................................86
D.8 InfiniBand Wiring Table for Two c7000 Enclosures with Single-Density Blades (Without an
External InfiniBand Switch)..................................................................................................................88
D.9 InfiniBand Wiring Table for Two or Three c7000 Enclosures with Single-Density Blades and an
External InfiniBand Switch...................................................................................................................89
D.10 One c7000 Enclosure with Double-Density Server Blades, the HP 4X DDR InfiniBand Switch
Module and Without an External InfiniBand Switch...........................................................................90
D.11 One c7000 Enclosure with Double-Density Server Blades, the HP 4X DDR InfiniBand Switch
Module, and an External InfiniBand Switch........................................................................................91
D.12 Two or Three c7000 Enclosures with Double-Density Server Blades and Using the HP 4X DDR
InfiniBand Switch Module....................................................................................................................92
D.13 One c7000 Enclosure with Single-Density Server Blades and the HP BLc 4X DDR InfiniBand
Gen2 Switch..........................................................................................................................................95
D.14 Wiring for Two c7000 Enclosures with Single-Density Server Blades and the HP BLc 4X DDR
InfiniBand Gen2 Switch (Without an External InfiniBand Switch)......................................................97
D.15 Wiring for Two or Three c7000s with Single-Density Server Blades and Using the HP BLc 4X
DDR InfiniBand Gen2 Switch...............................................................................................................98
D.16 One c7000 Enclosure with Double-Density Server Blades and the HP BLc 4X DDR InfiniBand
Gen2 Switch (No External InfiniBand Switch)...................................................................................101
D.17 One c7000 Enclosure with Double-Density Server Blades, the HP BLc 4X DDR InfiniBand Gen2
Switch and External InfiniBand Switches...........................................................................................102
D.18 Wiring for a Configuration of Two or Three c7000 Enclosures with Double-Density Server
Blades Using the HP BLc 4X DDR InfiniBand Gen2 Switch and External InfiniBand Switches........105
E Configuration Rules for CPE BladeSystems..............................................................111
E.1 CP Workgroup System Device and Interconnect Bays.................................................................111
E.2 CP Workgroup System Fan Bays..................................................................................................111
E.3 CP Workgroup System Power and Configuration Rules .............................................................111
E.5 CPE with c7000 Fan Bay Rules......................................................................................................113
E.6 CPE with c7000 Power Distribution Rules ...................................................................................113
F Cabling Tables for Rack-Mountable Servers............................................................115
F.1 Ethernet and Gigabit Ethernet Network Cabling Tables...............................................................115
F.1.1 In-Band Network Switch Console Network for 24 Nodes Using the ProCurve 2824 Gigabit
Ethernet Network Switch..............................................................................................................115
F.1.2 In-Band Network Switch Administrative Network for 1-20 Nodes Using the ProCurve
2824 Gigabit Ethernet Switch.........................................................................................................116
F.1.3 In-Band Network Switch Administrative Network for 21-32 Nodes Using the ProCurve
2848 Gigabit Ethernet Switch.........................................................................................................117
F.1.4 In-Band Network Switch Administrative Network for 1-20 Nodes Using the ProCurve
2626 Gigabit Ethernet Switch.........................................................................................................119
F.1.5 In-Band Network Switch Administrative Network for 21-32 Nodes Using the ProCurve
2650 Gigabit Ethernet Switch.........................................................................................................120
F.2 InfiniBand Cabling Tables for Rack-Mountable Servers...............................................................121
F.2.1 Cabling Topology and Rules.................................................................................................121
F.2.1.1 Using the Cabling Tables...............................................................................................121
Table of Contents
5

Advertisement

Table of Contents
loading

Table of Contents