Brocade Communications Systems Brocade 8/12c User Manual page 546

Brocade network advisor san user manual v11.1x (53-1002167-01, may 2011)
Hide thumbs Also See for Brocade 8/12c:
Table of Contents

Advertisement

18
Creating a new encryption group
14. Click Next.
FIGURE 212
15. Review the post-configuration instructions, which you can copy to a clipboard or print for later.
16. Click Finish to exit the Configure Switch Encryption wizard.
17. Review
For more information,referto the following topics:
502
All configuration items have green check marks if the configuration is successful. A red stop
sign indicates a failed step. A message displays below the table, indicating the encryption
switch was added to the group you named, and the public key certificate is stored in the
location you specified.
After configuration of the encryption group is completed, the Management application sends
API commands to verify the switch configuration. See
results"
on page 503 for more information.
The Next Steps dialog box displays
certificates for the encryption switch are displayed. These instructions are specific to the key
vault type.
Next Steps dialog box
"Understanding configuration status results"
"Adding a device to the device group"
"Creating a new master key"
"Understanding configuration status
(Figure
212). Instructions for installing public key
on page 503.
on page 470.
on page 548.
Brocade Network Advisor SAN User Manual
53-1002167-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Network advisor 11.1.xBrocade bladesystem 4/24

Table of Contents