14.Release and rotate heat-sink retention clip to its fully opened state. See
Figure 3-7. Position the heat-sink above the processor and align it with the
alignment posts. Put the heat-sink on the processor, press on the top of the
heat-sink and rotate the heat-sink retention lever up until it is locked.
Figure 3-7 Heat-sink installation
15.Ensure that the air baffle between processors is correctly installed, as shown
in Figure 3-1 on page 90.
16.Install a VRM in the connector next to the processor socket. The VRM and
handle are shown in Figure 3-8 on page 99.
98
Planning, Installing, and Managing the IBM System x3950 M2
Heat-sink retention clip
Alignment posts