Clearance Requirements for Airflow and T1600 Hardware Maintenance

Copyright © 2010, Juniper Networks, Inc.
The rack must be strong enough to support the weight of the fully configured router, up
to 606 lb (275 kg). If you stack two fully configured routers in one rack, it must be capable
of supporting about 1212 lb (550 kg).
Figure 48: Typical Open-Frame Rack
Always secure the rack to the structure of the building. If your geographical area is subject
to earthquakes, bolt the rack to the floor. For maximum stability, also secure the rack to
ceiling brackets.
Clearance Requirements for Airflow and T1600 Hardware Maintenance on page 77
Before You Install the T1600 Rack-Mounting Hardware
Installation Safety Warnings for M Series, MX Series, and T Series Routers on page 317
T1600 Router Description on page 3
When planning the installation site, you need to allow sufficient clearance around the
rack (see Figure 49 on page 78):