Power Off The Server - Lenovo ThinkEdge SE350 V2 User Manual

Hide thumbs Also See for ThinkEdge SE350 V2:
Table of Contents

Advertisement

Power off the server

The server remains in a standby state when it is connected to a power source, allowing the Lenovo XClarity
Controller to respond to remote power-on requests. To remove all power from the server (power status LED
off), you must disconnect all power cables.
Power button location and power LED are specified in:
Chapter 2 "Server components" on page 17
"Troubleshooting by system LEDs" on page 187
To place the server in a standby state (power status LED flashes once per second):
Note: The Lenovo XClarity Controller can place the server in a standby state as an automatic response to a
critical system failure.
• Start an orderly shutdown using the operating system (if supported by your operating system).
• Press the power button to start an orderly shutdown (if supported by your operating system).
• Press and hold the power button for more than 4 seconds to force a shutdown.
When in a standby state, the server can respond to remote power-on requests sent to the Lenovo XClarity
Controller. For information about powering on the server, see
"Power on the server" on page
43.
ThinkEdge SE350 V2 User Guide
44

Advertisement

Table of Contents
loading

This manual is also suitable for:

7da97dbk

Table of Contents