Figure 89. Removal of the PMB status LED cable from the power input board module
After this task is completed
• Install a replacement unit (see
"Install a power input board module" on page
120).
• If you are instructed to return the component, follow all of the packaging instructions and use any
packaging materials for shipping that are supplied to you.
Demo video
https://www.youtube.com/watch?v=tkbGEznMEuA
Install a power input board module
Follow instructions in this section to install a power input board module.
About this task
To avoid potential danger, make sure to read and follow the safety information.
• S002
ThinkEdge SE350 V2 User Guide
120