Power Distribution Board Replacement; Remove The Power Distribution Board Of The Fixed Power Supply - Lenovo ThinkSystem ST250 V2 Maintenance Manual

Hide thumbs Also See for ThinkSystem ST250 V2:
Table of Contents

Advertisement

Figure 91. Installing a PCIe adapter
After this task is completed
• Depending on the type of the PCIe adapter, you might need to connect any required cables.
– After installing RAID adapters, see Cable routing for hot-swap drives with hardware RAID to complete
the corresponding cable routing.
– After installing M.2 boot adapter, see "M.2 adapter, intrusion switch, and RAID flash power module" on
page 66 to complete cable routing.
– After installing the following RAID adapters, see "M.2 adapter, intrusion switch, and RAID flash power
module" on page 66 to complete cable routing for the RAID flash power module.
– ThinkSystem RAID 9350-16i 4GB Flash PCIe 12Gb Adapter (with flash power module)
– ThinkSystem RAID 9350-8i 2GB Flash PCIe 12Gb Adapter (with flash power module)
• Complete the parts replacement. See "Complete the parts replacement" on page 217.

Power distribution board replacement

Follow instructions in this section to remove and install the power distribution board.

Remove the power distribution board of the fixed power supply

Follow instructions in this section to remove the power distribution board of the fixed power supply.
About this task
To avoid potential danger, read and follow the following safety statements.
• S001
ThinkSystem ST250 V2 Maintenance Manual
162

Advertisement

Table of Contents
loading

This manual is also suitable for:

7d8f7d8g

Table of Contents