Lenovo ThinkSystem ST250 V2 Maintenance Manual page 193

Hide thumbs Also See for ThinkSystem ST250 V2:
Table of Contents

Advertisement

Figure 106. Installing a hot-swap power supply
After this task is completed
1. Connect the power cable to the power supply and a properly grounded electrical outlet.
2. If the server is powered off, power on the server. Ensure that both the power input LED and the power
output LED on the power supply are lit, indicating that the power supply is operating properly.
3. Complete the parts replacement. See "Complete the parts replacement" on page 217.
.
Chapter 4
Hardware replacement procedures
183

Advertisement

Table of Contents
loading

This manual is also suitable for:

7d8f7d8g

Table of Contents