The Instruction Handbook has a number of operations to be carried out by the Customer for a
minimum of basic maintenance, and other operations not always within his capacity.
For this reason, the Service Centre should be responsible for keeping the machine in perfect
working order, by means of a periodic maintenance program, to be carried out at pre-established
intervals (for example at the end of the season or in anticipation of a long period of inactivity), ac-
cording to the following table which indicates the main interventions.
Tripping of the safety devices check
Tyre pressure check
Belt PTO check
Steering adjustment
General lubrication
Shaft lubrication on front wheels and quick
couplings.
Transmission check

Test driving

Operation Notes:
1) Check that the PTO belt engages the rotation of the implement at the pre-set time and that it is
not slipping during normal load operation. If necessary adjust.
2) Verify that the unit is operating correctly and without abnormal noises.
2.3.2 Test driving
If a cutting device or other equipment is provided, they must be installed before performing the test
drive with the machinery. Drive the machine for a few minutes
– Check all functions. More specifically check that all safety devices are properly functioning.
– Make sure that there are no vibrations or abnormal noises; check that the steering, controls and
pedals are working properly.
2 - INFORMATION FOR SERVICE CENTRES
Intervention Type
1)
2)
CHAPTER

2.3 SERVICING

First time
5
5
5
5
5
Servicing
Hours/Months of use
50 / 12
50 / 12
50 / 12
50 / 12
50 / 12
100 / 24
100 / 24
50 / 12
EDITION
PAGE
2018
14 /
84
[
...]
[2.4.1]
[2.6.1]
[6.2.1]
[4.2.2]
[2.5]
[2.5]
[--]
[2.3.2]