Performing A Template Audit - Nortel Meridian Meridian 1 Upgrade Manual

81c igs to cs 1000m mg cp pii fnf upgrade
Hide thumbs Also See for Meridian Meridian 1:
Table of Contents

Advertisement

Table 3
Print site data (Part 4 of 4)
Site data
Superloops and XPEs
Note: Items marked with asterisks (*) are required printout for conversion. Other items are
recommended for a total system status.

Performing a template audit

Communication Server 1000M and Meridian 1
Preparing and planning for the upgrade
A template audit (LD 01) reviews the templates in your system. Corrupted
and duplicate templates are cleaned up. An example of the information
generated during the audit is listed below.
Note: The template audit may take an extended period of time on large
systems. Run the audit during a low traffic period.
CAUTION — Service Interruption
Loss of Data
Do not abort this overlay until the audit is complete. If the
overlay is interrupted, data will be corrupted.
Print command
LD 97
REQ
TYPE
SUPL
81C IGS to CS 1000M MG CP PII FNF Upgrade
Page 29 of 284
CHG
SUPL
Vxxx
V stands for a virtual
superloop and xxx is
the number of the
virtual superloop.
xxx = 0-252 in
multiples of four for
MG 1000E
xxx = 96-112 in
multiples of four for
MG 1000T (See Table
29)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1Communication server 1000m

Table of Contents