Unpacking Help Files For Virtual Terminal Emulator; Logging In To The Signaling Server - Nortel Meridian Meridian 1 Upgrade Manual

81c igs to cs 1000m mg cp pii fnf upgrade
Hide thumbs Also See for Meridian Meridian 1:
Table of Contents

Advertisement

Unpacking Help files for Virtual Terminal Emulator

Logging in to the Signaling Server

Communication Server 1000M and Meridian 1
8
Click Save and Transfer to transfer the updated IP Telephony node
information to the other elements of the node. Refer to Transferring IP
Telephony files, and IP Line: Description, Installation, and Operation
(NN43001-500) for detailed instructions on transferring IP Telephony
node information.
Help files for the Virtual Terminal Emulator (VTE) component of Element
Manager are copied to the Signaling Server as compressed files during
installation of the Signaling Server software.
Unpacking the Help files is optional. However, they can be unpacked at any
time after the Signaling Server software is installed. To unpack the files, refer
to Signaling Server: Installation and Commissioning (NN43001-312).
Unpacking the Help files takes approximately 20 to 30 minutes. Nortel
recommends that you unpack the files during a service outage.
Refer to Element Manager: System Administration (NN43001-632) for more
information on Element Manager and the Virtual Terminal Emulator.
Use Procedure 63 on
Signaling Server from a maintenance terminal.
Installing a Signaling Server
End of Procedure
IMPORTANT!
page 260
to log in to the vxWorks
81C IGS to CS 1000M MG CP PII FNF Upgrade
Page 259 of 284
TM
shell to access the

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1Communication server 1000m

Table of Contents