Performing the upgrade
Procedure 31
Cabling the Clock Controllers
Note: Earlier in the upgrade, you checked that Clock Controller 1 is
installed in Network 1 shelf 1, slot 13; and Clock Controller 0 has been
moved to Network group 1 shelf 0, slot 13.
Note: Connect the cables to the Clock Controllers as shown in Figure 14
on
page
113:
1
Connect the Clock to Clock cable:
a.
Connect J1 of the NTRC49 cable to port J3 of Clock Controller 0.
b.
Connect J2 of the NTRC49 cable to port J3 of Clock Controller 1.
2
Connect a Clock 0 to FIJI cable:
a.
Connect J2 of the NTRC46 cable from Clock 0 to J4 of the FIJI card
in Group 0, shelf 1.
End of Procedure