Performing the upgrade
Power up Core 1
NN43021-469 Standard 01.01 May 2007
Procedure 21
Preparing for power up
1
Check that a terminal is connected to the J25 I/O panel connector
(COM 1) on Core/Net 1.
Note: A maintenance terminal is required to access the Core/Net
modules during the upgrade.
2
Connect a terminal to the J25 port on the I/0 panel in the inactive Core.
3
Check the terminal settings as follows:
a.
9600 Baud
b.
8 data
c.
parity none
d.
1 stop bit
e.
full duplex
f.
XOFF
Note: If only one terminal is used for both Cores, the terminal will have
to be switched from side to side to access each module. An "A/B" switch
box can also be installed to switch the terminal from side to side.
4
Faceplate enable all core and network cards.
5
Faceplate enable the power supply.
End of Procedure