Nortel Meridian Meridian 1 Upgrade Manual page 95

81c igs to cs 1000m mg cp pii fnf upgrade
Hide thumbs Also See for Meridian Meridian 1:
Table of Contents

Advertisement

Communication Server 1000M and Meridian 1
ALL OF THE RECOMMENDED PATCHES)
Installation of DepList on an SSC system through software
installation
The DepList should be installed during the software
installation if it is present in the PC Card/Pre-Programmed
daughter board.
Do you wish to install Dependency Lists? (y/n/
[a]bort) :
The installation continues as below:
INSTALLING NEW SOFTWARE AND FILES:
Erasing flash ROM
Installing new flash ROM software modules:
Programming: auxres
Programming: diskos
Programming: sl1res
Programming: ovlres
Programming: loadware
Programming: remupg
Calculating CRC-32 on flash ROM program store
Installing new directory record
Installing new files
Installing Dependency Lists
Building system loadware
Done.
Note:
Once the installation is complete and the
system reboots, the PEPs that are installed will
be automatically put into service. This can be
seen by issuing the ISSP command in LD 22.
If the response to the above query is "NO", the
user is prompted to confirm the selection.
For example:
Do you wish to install Dependency Lists? (y/n/
[a]bort) : n
Are you sure? (y/n/[a]bort) : y
Performing the upgrade
81C IGS to CS 1000M MG CP PII FNF Upgrade
Page 95 of 284

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1Communication server 1000m

Table of Contents