Nortel Meridian Meridian 1 Upgrade Manual page 118

81c igs to cs 1000m mg cp pii fnf upgrade
Hide thumbs Also See for Meridian Meridian 1:
Table of Contents

Advertisement

Page 118 of 284
NN43021-469 Standard 01.01 May 2007
Performing the upgrade
17 Remove the power harness and reserve it for reinstallation as part of
installing the new NT4N40 card cage. The power harness is located at the
right rear lower corner and plugs into the rear of the power supply.
For AC systems, relocate power harness NT8D40.
For DC systems, relocate power harness NT7D11.
WARNING
Be sure to perform the following step. If you do not tape
the EMI shield in position, you cannot install the card cage
in the module correctly.
18 Reposition the EMI shield (it looks like a brass grill) in the base of the
module. Tape over the front mounting tabs to hold the shield in position.
You will remove the tape later.
CAUTION
Damage to Equipment
Check for and remove any debris (such as screws) that
fell into the base of the UEM module.
End of Procedure

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1Communication server 1000m

Table of Contents