Readiness Checklist - Nortel Meridian Meridian 1 Upgrade Manual

81c igs to cs 1000m mg cp pii fnf upgrade
Hide thumbs Also See for Meridian Meridian 1:
Table of Contents

Advertisement

Readiness checklist

Communication Server 1000M and Meridian 1
rack mounting, as opposed to two-post rack mounting for the Nortel ISP1100
server.
Instructions to install an IBM X306m or HP DL320-G4 COTS 1U server
are not included in this chapter. Detailed installation instructions can be
found in the IBM xSeries 306m Types 8848 and 8491 User Guide or the
HP ProLiant DL320 Generation 4 Server User Guide shipped with the
server.
Before installing a Signaling Server in a CS 1000 system, complete the
following checklist.
Installing a Signaling Server
IMPORTANT!
WARNING
Do not modify or use a supplied AC-power
cord if it is not the exact type required in the
region where the Signaling Server is installed
and used. Be sure to replace the cord with
the correct type.
81C IGS to CS 1000M MG CP PII FNF Upgrade
Page 177 of 284

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1Communication server 1000m

Table of Contents