Using the BayStack 450 10/100/1000 Series Switch
Verifying the Installation
When power is applied to the switch, power-on self-tests run. You can verify
proper operation of the BayStack 450 switch by observing the front-panel LEDs
or by viewing the self-test results as displayed in the BayStack 450 switch
Self-Test screen.
Verifying the Installation Using the LEDs
To verify the installation using the LEDs, check that the switch power-up
sequence is as described in Table 2-1:
Table 2-1.
Power-Up Sequence
Stage
Description
1
Immediately after AC power is
applied to the switch, DC power
is available to the switch's
internal circuitry.
2
The switch initiates a self-test.
Power LED
Status LED
Figure 2-10.
Observing LEDs to Verify Proper Operation
2-14
LED indication
The Power LED turns on within 5 seconds (Figure 2-10). If the
Power LED does not turn on, verify that power is available at the
AC power outlet and that the power cable is fastened securely at
both ends. If the Power LED remains off, contact the sales agent
or the customer service representative from whom you
purchased the switch.
As the self-test initiates subroutines, the port status LEDs flash
various patterns. When the switch passes the self-test (within 10
seconds), the Status LED turns on (Figure 2-10).
If a nonfatal error occurs during self-test, the Status LED blinks.
If the switch fails the self-test, the Status LED remains off.
Contact the sales agent or the customer service representative
from whom you purchased the switch.
450-24T Switch
BayStack
1
3
5
7
9
11
13
15
17
19
Cas
Pwr
Up
Status Dwn
2
4
6
8
10
12
14
16
18
20
RPSU Base
21
23
10/100
Activity
22
24
10/100
Activity
BS45040A
309978-D Rev 01