QFX10002 Switch Hardware Guide
Table 28: Site Preparation Checklist (continued)
Item or Task
Verify that your rack meets the
minimum requirements for the
installation of the switch.
Plan rack location, including
required space clearances.
Secure the rack to the floor and
building structure.
Cables
Acquire cables and connectors:
Determine the number of
cables needed based on your
planned configuration.
Review the maximum distance
allowed for each cable.
Choose the length of cable
based on the distance
between the hardware
components being connected.
Plan the cable routing and
management.
Related
Documentation

QFX10002 Site Guidelines and Requirements

66
For More
Information
"QFX10002 Rack
Requirements" on
page 71
"QFX10002 Clearance
Requirements for
Airflow and Hardware
Maintenance" on
page 69
The Hardware
See
Compatibility Tool
.
Performed By
Date