Installation - New Holland T8010 Manual

Hide thumbs Also See for T8010:
Table of Contents

Advertisement

Installation

STEP 21
1
Install a new firewall to brake valve gasket and install
the brake valve, making sure that the brake link rods
(1) are installed into the poppet sleeves (2). Install and
tighten the three mounting bolts (3). See the Pedal
and Pedal Switch Adjustment Section of this Service
Manual for the brake pedal adjustment procedure.
STEP 22
1
2
Install new O-rings on all hose and tube connectors.
Install the supply and return lines, the right and left brake
lines (1) and the brake switch connectors (2). Start vehicle
and check for leaks and proper brake switch operation.
Section 33 - Brakes - Chapter 1
3
3
3
2
Rd02K119
1
RD0K118
33-1-8
STEP 23
Install the right side air duct.
STEP 24
If equipped, install the foot throttle.
STEP 25
Install top steering column cover and connect all
electrical connectors.
101RS35A
RD02K120
102RS4

Advertisement

Table of Contents
loading

This manual is also suitable for:

T8020T8030T8040

Table of Contents