Post Flushing Procedures
STEP 85
Identify and remove the source of the contamination.
STEP 86
Reconnect all fittings using new HNBR "green"
HFC-134a compatible O-rings. Lubricate the O-rings
with mineral oil prior to installation.
STEP 87
Install a new receiver-drier.
NOTE: The receiver-drier should be replaced just
before the system is drawn to a deep vacuum to
avoid saturating it with moisture.
STEP 88
Clean or replace the thermal expansion valve.
Section 50 - Climate Control - Chapter 2
50-2-48
RP00G006
RD05E030
RP00G011