Compressor Installation - New Holland T8010 Manual

Hide thumbs Also See for T8010:
Table of Contents

Advertisement

Compressor Installation

IMPORTANT: If a new compressor is to be installed, its oil level must be adjusted to match the removed
compressor. See Oil Level Check or Adjustment, page 79.
STEP 139
Install the compressor with the three bolts removed
earlier. Torque to 29 ± 4 ft lb (39 ± 4 Nm).
IMPORTANT: Install the ring terminal ground to the
upper front bolt when installing the compressor.
STEP 140
Slowly remove the protective cap, and install the 90°
elbow in the suction port on the compressor.
NOTE: Use caution when removing the caps on a
new compressor; new compressors are pressurized
when shipped.
STEP 141
Install a new O-ring and connect the low pressure
line to the 90° elbow. Suppor t the elbow with a
wrench when connecting the line.
NOTE: Lubricate the O-ring with mineral oil before
installation.
Section 50 - Climate Control - Chapter 2
50-2-85
RD02H045
RD02H043
RD02H044

Advertisement

Table of Contents
loading

This manual is also suitable for:

T8020T8030T8040

Table of Contents