New Holland T8010 Manual page 1155

Hide thumbs Also See for T8010:
Table of Contents

Advertisement

Section 50 - Climate Control - Chapter 2
STEP 170
Lubricate new O-rings with clean mineral oil and
install in the fittings on the suction and liquid lines.
Connect the liquid and suction lines to the expansion
valve using the two hand, two wrench method.
STEP 171
Remove air and moisture from the system and
charge the system. Leak test all connections with
OEM1437 before reapplying any thermal insulation
tape.
STEP 172
RD02G106
Replace all thermal insulation tape and reconnect the
low pressure cutout switch.
NOTE: The thermal insulation tape is available in 30
ft. (9150 mm) bulk rolls - 1954475C1 - 0.12 x 2.5
inches x 30 ft. [3 x 63.5 x 9150 mm].
50-2-94

Advertisement

Table of Contents
loading

This manual is also suitable for:

T8020T8030T8040

Table of Contents