Omron Z4LB V2 Instruction Manual page 46

Parallel beam linear sensor
Table of Contents

Advertisement

Sensor Installation
Refer to 7-2 Dimensions for mounting dimensions (p. 64).
Z4LB-Ajj40V2/Z4LB-Ajj40PV2 Sensors
There are two mounting holes, one on the right and one on the
left. Screw the holes to install and secure the emitter and the re-
ceiver. When installed, the head of screws should not enter the
beam.
Refer to 7-2 Dimensions for mounting dimensions (p. 64).
Note Do not disconnect the coupling bracket that connects the receiv-
er and the emitter, otherwise proper measurement will not be
possible.
2-5-2
Amplifiers
There are two mounting holes. Insert the screws into the holes to
install the Amplifier. The Amplifier can also be mounted to DIN
Track.
Refer to 7-2 Dimensions for mounting dimensions (p. 64).
2 Secure the mounting brackets.
Screws (M4)
Screws (M4)
Screws (M4)
Section
2-5
21

Advertisement

Table of Contents
loading

Table of Contents