Trane CVRC-M-1D Manual page 9

Table of Contents

Advertisement

2. Start the Unit
[ ] As the unit starts and runs, observe closely all operating conditions.
[ ] Adjust the oil pressure regulator if necessary.
[ ] Run the Purge to allow the removal of non-condensables.
[ ] After the unit has the system down to design leaving chilled water temp and is under control,
and the purge is no longer relieving non-condensables, begin taking the startup test log. Log
the unit a minimum of three times at 15 minute intervals.
[ ] Review test log data to insure all sensor values are reasonable.
[ ] When the logging is complete, shut the chiller down.
[ ] Restart the chiller and carefully observe the starting and loading sequence.
3. Instructions to the Chiller Operator.
[ ] Instruction for starting, operating and shutting down.
[ ] Instructions for logging the unit.
[ ] Instructions for periodic maintenance.
Comments and/or Recommendations:
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
Service Technician
CVRC-M-1D
Water Cooled Chillers with FastPak
Commissioning Checklist and
startup Test Log
______________________________________________
Signature
Date
9

Advertisement

Table of Contents
loading

Table of Contents