Installing the PTX5000 Mounting Hardware for an Open-Frame Rack
Installing Cage Nuts, If Needed
Copyright © 2012, Juniper Networks, Inc.
Chapter 7: Installing the PTX5000 Packet Transport Switch Mounting Hardware
Figure 33: Center-Mounting Bracket Removal
Center-mounting bracket
Installing Cage Nuts, If Needed on page 71
1.
Installing the Open-Frame Rack Mounting Shelf on page 73
2.
Insert cage nuts, if needed, into the holes listed in
page
72. The hole distances are relative to the standard U division on the rack that is
aligned with the bottom of the mounting shelf and rear support bracket.
To install cage nuts in an open-frame rack:
On the rear side of both rack rails, insert cage nuts in the holes specified for the
1.
open-frame mounting shelf (see
On the front side of both rack rails, insert cage nuts in the holes specified for mounting
2.
the chassis (see
Table 29 on page
Table 28 on page 72
Table 28 on page
72).
72).
and
Table 29 on
71