Installation Qualification Checklist - Teledyne Foxy R1 Instruction Manual

Hide thumbs Also See for Foxy R1:
Table of Contents

Advertisement

2.5 Installation
Qualification
Checklist
Table 5-1 Installation Qualification Checklist
Step
Description
2.1
Preliminary Checkout
2.2.1/
Standard Diverter Valve
2.2.2
Connections or High Flow
Diverter Valve Connections
2.2.3
Drip Tray Drain Connection
2.3
Rack Installation
2.4
Diverter Valve Adjustment
Certification of Section 2 Completion
Installer Name (print):
Installer Signature:
Operator Name (print):
Operator Signature:
Comments:
®
Foxy
R1 and Foxy
Section 2 Preparation for Use
Installer
Initials
Date:
Date:
®
R2 Fraction Collectors
Operator
Initials
2-13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents