Chapter 4: Hardware Installation
4.3

Cabinet Transportation

To move and locate all the equipment to the final position, employ a transportation company
specializing in heavy electronic equipment transport.
4.3.1

Transportation Safety Considerations

WARNING:
Crush hazard could result in personal injury or equipment damage.
MTS LiTE cabinet with packaging can weigh up to 49 kg, MTS 2 cabinet with packaging up to
64 kg and MTS 4 cabinet with packaging up to 170 kg.
Follow the instructions below when moving the equipment.
Equipment racks should only be lifted without the use of lifting equipment when there are sufficient
personnel available to ensure that regulations covering Health and Safety are not breached. Motorola
Solutions recommends the use of appropriate powered mechanical lifting apparatus for moving and
lifting the equipment racks. In addition to these points, refer to and comply with any local regulations
that govern the use of lifting equipment.
4.3.2

MTS LiTE and MTS 2 Cabinets Transportation

For MTS LiTE and MTS 2 cabinet, Motorola Solutions recommends the use of a sack trolley or
appropriate lifting straps for transportation.
WARNING: A sack trolley will generally be used from the front of the MTS LiTE or the MTS 2 as
this allows it to be moved into position. Protective padding or cardboard should be placed
between the MTS and the sack trolley to prevent equipment damage.
4.3.3

Moving the MTS 4 and Expansion Cabinet

MTS LiTE cabinet with packaging can weigh up to 49 kg, MTS 2 cabinet with packaging up to 64 kg
and MTS 4 cabinet with packaging up to 170 kg.
WARNING: Crush hazard could result in personal injury or equipment damage.
IMPORTANT:
Lift equipment racks without the use of lifting equipment only when there are sufficient
personnel available.
Use appropriate powered mechanical lifting apparatus for moving and lifting the equipment
racks
See to and comply with any local regulations for the use of lifting equipment.
Procedure:
1 Visually check the lifting brackets and associated rack hardware for transit damage.
If any damage is apparent, contact Motorola Solutions for replacement. Correct lifting bracket
tightness and alignment are crucial to ensure intended lifting capacity.
2 Screw the lifting brackets to both sides of the MTS 4 cabinet.
The holes are pre-drilled. Use the three screws for each bracket.
88