Installation Prerequisites - Motorola MTS LiTE Installation, Configuration And Basic Service Manual

For dimetra x core, dimetra express, dimetra ip scalable (dips), dimetra ip compact (dipc)/scalable.
Table of Contents

Advertisement

2 Check the MTS equipment against the itemized packing list.
3 If available, check the sales order with the packing list to account for all equipment ordered.
NOTICE: Contact your Motorola Solutions representative to report the missing items and
for additional information.
4 Check for loose or damaged equipment.
5 Check all sides of the Base Stationcabinet for dents, scratches, or other damage.
6 Check all cabinet wiring to ensure that connections are in place.
7 Check modules and boards for physical damage to controls or connectors.
8 Verify that ground straps are secure.
9 If any equipment is damaged, contact the shipping company immediately, and then your
Motorola Solutions representative.
4.2

Installation Prerequisites

Proper installation ensures the best possible performance and reliability of the MTS station. Before
performing installation tasks, plan the mounting location of the cabinet in relation to input power,
antennas, and site link interfaces. Also, consider the site environment conditions, the particular
mounting method, and required tools and equipment.
For full instructions and guidelines, see the Motorola Standards and Guidelines for Communications
Sites, R56 manual.
Process:
1 Complete the antenna installation (including GPS antenna).
2 For buildings with no grounding: install earthing.
3 Order the installation of the Ethernet, X.21, or E1 link (to the control center) to the site link
service provider.
4 Install the cable tray in the equipment room.
5 Optional: Increase the mains power supply capacity to serve all the site equipment.
6 Optional: Increase the stand-by mains power supply capacity to serve all the site equipment.
7 Complete any civil works on the site (for example, new or modified accommodation, new access
road, and so on).
8 Agree on and mark the floor position of each piece of the equipment.
9 Optional: Reinforce the site floor to accommodate load of site equipment.
10 Order delivery and placement of all the equipment to its final position to the transportation
company.
11 Install the proper surge protection on Ethernet, E1/X.21 site links, all antennas, and power inputs
to prevent potential damage to the MTS.
6802800U74-AN
Chapter 4: Hardware Installation
87