Installing The Tp-260; Unpacking The Board - Avaya S6200 Manual

Conferencing servers, meeting exchange 4.1
Hide thumbs Also See for S6200:
Table of Contents

Advertisement

Updating Hardware
4. Ethernet RJ-45 connector
5. Four T1/E1 RJ-48c trunk connectors
6. E1/T1/J1 LEDs
7. PCI adaptor

Installing the TP-260

!
CAUTION:
Installation of Gateway Board should be performed by Authorized, qualified
CAUTION:
Person.
VOLTAGE ALERT:
Prior to installation of Audio codes board in a chassis, always correctly connect
VOLTAGE ALERT:
the chassis to a safety ground according to the laws and regulations of the
country in which the installation is performed
ELECTROSTATIC ALERT:
Electronic Components on the PCB are extremely sensitive to static electricity, to
ELECTROSTATIC ALERT:
reduce the risk of damage due to ESD when installing or servicing electronic
equipment, it is recommended that anti-static grounding straps and mats to be
used.

Unpacking the board

The TP260 Gateway board is shipped in a box, along with the following items:
TP260 board sealed in Antistatic bag - Qty 1
Trunk Splitter Cables
CD - Documentation
Hardcopy documents
Follow this procedure to unpack the board components:
1. Remove each item from the box and examine for any obvious physical damages. If you
notice any damages, log your observations, and immediately report the problem to
management so that proper action may taken.
!
Important:
If you see any physical damage on the board or packing, return board to factory
Important:
for replacement, with remarks.
46 Installing the S6200, S6500, and S6800 Conferencing Server
- Qty 4
- Qty 1
- Qty 1

Advertisement

Table of Contents
loading

This manual is also suitable for:

S6800

Table of Contents