5. Using the closed-loop fasteners, secure the water hoses to the cold plate installation carrier as shown
in Figure 28.
Figure 28. Fastening the water hoses to the carrier
6. Secure each cold plate to its corresponding plastic carrier.
a. Pivot the holder up. Pinch in at the sides to remove the holder from the carrier as shown in
Figure 29 on page 23.
22
Power Systems: Servicing the IBM Power System S822LC (8335-GTB)